Fabricator does not produce cement from stone | fabricator, cement, production

1 votes
Voting disabled

• Build Version: v0.1.0-alpha.(19629)
• Description: I have fabricators set up for stone, copper, quartz, and iron. All of them work except the one processing stone. The fabricator has power and is connected correctly, but it does not fabricate stone into cement.
• Expected Behavior: The fabricator should process stone into cement when powered and connected correctly.
• Attachments: Not provided

Resolved Machines Medium Priority Issue UI Suggested by: FelicisJinx Upvoted: 21 Dec, '25 Comments: 1

Comments: 1
OldestNewestMost likesFewest likes